Sector 79, Gurgaon
True Habitat Bodh 79 is an affordable housing project Under PMAY. This affordable housing project offers 2BHK and 3BHK apartments at affordable costs. True Habitat Bodh 79 launched in Sector 79, Golf Course Extension Gurgaon. In this project, we got luxury amenities with a top-teir security system.
If we talk about True Habitat Bodh 79 Location then Sector 79 is one of the best and unique locations in Gurugram. Because Sector 79 Gurgaon has all major connectivity and green space. You will get fresh air and a healthy environment. True Habitat Bodh 79 is spread over approx. 5.3 Acres.
True Habitat Bodh 79 launched under affordable housing policy 2013. Offers 2 BHK and 3 BHK spacious flats with top-quality construction.
If you are looking for an affordable housing flat at Golf Course Extension Belt. Then it could be your first choice because True Habitat Bodh 79 offers all luxury amenities and top-quality construction at a reasonable cost. You should check it once.
Project Name | Bodh 79 |
Developer Name | True Habitat |
Location | Sector 79, Gurgaon |
Unit Type | 2 BHK & 3 BHK |
Total Area | 4.5 Acres* |
Project Type | Affordable Housing Project |
HRERA NO. | 23 OF 2022 |
Total Towers | 6 Residential Tower + 2 Commercial Block |
Starting Price | 27.78 Lacs* |
Possession | 4 Years |
True Habitat is also a multi-dynamic and varied developer primarily based inside the millennium town of Gurgaon.
True Habitat has been handling many businesses like land, Mining, Construction, and Education.
The developer has forayed into businesses like welcome, Filling Stations, and natural phenomenon over the past 10 years.
With a humble starting inside the industry, the True Habitat witnessed modest growth however it’s reached its current state because of our specialization in commitment, integrity, the price for cash, and dedication.
We’ve engineered confidence and trust with persistent diligence. we have a tendency to started with individual housing comes and went on to launch leading mega-million comes with superior excellence.
True Habitat ventured into the event trade with a modest begin however grew to its current stature entirely due to our specialize in core values of integrity, commitment, dedication, and delivering the price to each consumer.
Trust Associate in nursing confidence-building takes an extended time to form and extended diligence to understand however inside the top our efforts have borne fruit.
Beginning with tiny individual housing contracts, we have a tendency to went on to larger comes, and nowadays, we have a tendency to handle mega-million comes with fluid mastery.
Yoga Center and Meditation Hall
Pollution Free
CCTV Camera Surveillance
Lush green parks with running track
Lift
Earthquake Resistance
Drawing / Dining Room |
|
Floor | Vitrified Tiles |
Ceiling | Oil Bond Distemper |
Wall | Oil Bond Distemper |
Bed Room |
|
Floor | Vitrified Tiles |
Ceiling | Oil Bond Distemper |
Wall | Oil Bond Distemper |
Kitchen |
|
Floor | Vitrified / Ceramic Tiles |
Wall / Ceiling | Oil Bond Distemper |
Dado | Ceramic tiles 600mm above-counter |
Counter Top | Green Marble / Granite |
Fittings & Fixtures | ISI marked CP Fittings & Single drainboard sink |
Balconies |
|
Floor | AntiSkid / Matt Finish Ceramic Tiles |
Railing | M S railing with Enamel Paint Finish |
Toilet & Bath |
|
Floor | Anti Skid Ceramic Tiles |
Wall | Ceramic Tiles till 4Feet / 7′-0″ feet high & Oil Bound Distemper Above |
Ceiling | Grid False Ceiling |
Fittings & Fixtures | ISI marked CP Fittings, W.C & Washbasin |
Doors & Windows |
|
Internal Doors Frame | Hard Wood / Red Morandi |
Internal Doors Shutter | Main Door – Both Side Laminated Flush Door & Internal Flush Door with the Painted finish on Both Side |
External Doors & Windows | Aluminium Powder Coated /UPVC |
Electrical |
|
Wiring | Copper Electrical Wiring throughout in concealed conduit for light point |
Switches / Socket | ISI Marked Switches & Sockets |
Terrace |
Brick Bat Koba or Water Proofing Treatment |
Structure |
Earthquake Resistant RCC Framed Structure as per Seismic Zone |
External Development |
|
Internal Roads | Tremix Concrete Road / Interlocking Blocks |
Boundary Wall | RCC / Brick wall with Plaster & External weather Proof Paint Finish |
External Development | Weather Proof Texture Paint in Buildings |
Particulars | Installments |
At the time of submission of the application for allotment | 5% of BSP |
within Fifteen days of the date of issuance of allotment letter | 20% of BSP |
Within six months of the date of issuance of allotment letter on completion of construction of raft and RCC slab upto ground floor level | 12.5% of BSP |
Within twelve months of the date of issuance of allotment letter on completion of construction of RCC slab upto 8th floor level . | 12.5% of BSP |
Within Eighteen months of the date of issuance of allotment letter on completion of construction of RCC slab upto 14th floor level . | 12.5% of BSP |
Within twenty four months of the date of issuance of allotment letter on completion of construction of RCC slab upto 19th floor level of Tower 5 and completion of brick work of all the towers. | 12.5% of BSP |
Within thirty months of the date of issuance of allotment letter on completion of internal finishing | 12.5% of BSP |
Within thirty six months of the date of issuance of allotment letter on completion of external finishing and on application of occupation certificate. | 12.5% of BSP |